A Decision Regulation Impact Statement (RIS) incorporates comments and feedback from submissions received on the Consultation RIS. It assists decision-making about adopting a regulatory proposal.
A Decision RIS is only available after decision makers have made a determination on the matter, as it reflects the outcome of the process.
NCC 2022 Residential energy efficiency provisions
The following documents are available:
- Decision RIS – energy efficiency 2022
- Decision RIS Appendices – energy efficiency 2022
- CBA of upgrading fabric from 6 to 7 stars
- DRIS companion technical document-final
- TIC Industry Consultation on Building Fabric Costs
- Evaluating the impact of thermal bridging on energy savings predicted for the NCC 2022 RIS
Bushfire provisions for certain Class 9 buildings
Lead in plumbing products in contact with drinking water
The following documents are available:
Proposal to include minimum accessibility standards
The following documents are available:
Energy efficiency of commercial buildings
The following documents are available:
Inclusion of heating and cooling energy load limits in NatHERS assessments
The following documents are available:
Accessible adult change facilities in public buildings
The following documents are available:
Fire safety in Class 2 and 3 residential buildings
The following documents are available:
Application of temperature control requirements for heated water
The following documents are available:
Assessment of the NCC’s fire hose reel requirements for Class 5 office buildings
Fire sprinklers for covered balconies
The following documents are available:
Emergency Egress for People with Disability
Archived ABCB Decision (Final) RIS' are also available for download from the Resource library.